HUAWEI BTS3900L PDF

Indoor model: BTS, BTSL. − Outdoor model: BTSA. ○ Distributed base station: DBS BTS BTS, the indoor macro base station. Huawei series LTE FDD base stations can be classified into indoor macro base stations (BTS and BTSL), outdoor macro base stations. Manuals and User Guides for Huawei BTSL GSM. We have 1 Huawei BTSL GSM manual available for free PDF download: Installation Manual.

Author: Nezshura Mirr
Country: Bahrain
Language: English (Spanish)
Genre: Environment
Published (Last): 21 September 2006
Pages: 270
PDF File Size: 4.72 Mb
ePub File Size: 3.42 Mb
ISBN: 558-7-89709-847-6
Downloads: 23134
Price: Free* [*Free Regsitration Required]
Uploader: Brakasa

AR Series Access Routers. Page 77 Fiber optic cables cannot be squeezed by the cabinet door when routed through the cabinet, as shown in FigureFigure Figure Installing The Gatm And Bias-tee The installation of cabinets must meet the requirements of the proper design, practical installation, and elegant layout. Installing The Gps Surge Protector Installing The Power Cables Step 5 Use a screwdriver to tighten the screws on the wiring terminals. Installing The Monitoring Signal Cables Page 38 Step 5 Use a level to check the cabinet level, as shown in Figure Replace the subrack if necessary.

Huawei BTSL GSM Manuals

Change password No account? Page 2 All other trademarks and trade btx3900l mentioned in this document are the property of their respective holders. Return New post Share. Preparing Tools And Meters Small Configuration Scenario Iii: IT Infrastructure Storage Solution.

Examples of information displayed on the screen are in Courier New. Unpacking The Equipment The total number does not tally with the Find out the cause and report any missing packing list articles to the local Huawei office. Page 37 Step 3 Remove the cabinet door to facilitate operations, as shown in Figure What are the network architecture and logical structure of the base station? Obtaining The Esn Installing The Monitoring Signal Cables bts9300l The optical bts33900l and fiber optic cables are of the multimode type.

  FREDERICK LEBOYER LOVING HANDS PDF

Huawei BTS3900L Installation Manual

We will follow up with you as soon as possible. C Installation Guide 06 This is the huawie official release. Education Cloud Data Center.

Small Configuration Scenario Ii: Installation Guide 8 Installing the Cabinet Context When installing a BTSL on a base, use a marking template matching the base to determine the positions of the holes for installing the cabinet.

Installing The Cables For series GSM base stations running in the network, the following documents are provided: Page 97 Vts3900l the puller on the optical module. Buawei Global – English. Document Preparations This section describes the reference documents that must be ready before the installation.

Drag Press and hold the primary mouse button and move the pointer to a certain position. Figure BTSL in a single- or dual-mode scenario 1. Install the equipotential cable on the door. Product Versions The following table lists the product versions related to this document.

Huawei BTSA & BTSL

Table of contents About This Document By pressing ‘print’ button you will print only current page. Unpacking The Equipment GSM base stations developed by Huawei provide GSM radio access network RAN solutions that apply to multiple scenarios based on customers requirements and network environment.

  ALL SHE WAS WORTH MIYUKI MIYABE PDF

Therefore, you must insert an fiber optic cable into an unpacked optical module within 20 minutes. Step 2 Check the exterior of the packing case. Small Configuration Scenario I: Optional Installing The Modules Small Configuration Scenario Ii: Installing An Rf Jumper Page 40 Align the spring pin with the hole, rotate the pin to the right until it is tightly pressed by the door.

Prerequisites The input power cables are correctly and securely connected. Connected to the jumper of the base station. This site uses cookies.

Indoor Macro Base Station BTS3900

Step 4 Test the insulation between the base and the expansion bolt. Installation Clearance And Position Requirements The installation of cabinets must meet the requirements of the proper design, practical installation, and elegant layout.

The total number does not tally with the Find out the cause and report any missing packing list articles to the local Huawei office. Page 42 Installation Guide 8 Installing the Cabinet Context When installing a BTSL on a base, use a marking template matching the base to determine the positions of the holes for installing the cabinet. This document is very well done.

Smart Modular Data Centers. By continuing to browse the site you are agreeing to our use of cookies.